Stevensons Structural was awarded this prestigious contract with Dulux in August 2010.

Stage 2 is the new water based paint manufacturing building and the objective of this contract was to allow the existing plant to remain operative while the new building was constructed around and over the existing operation. The contract consisted of three parts, new inwards, existing operation and dispatch areas.

Tonnage for this job was 130 tonnes plus purlins. Apart from the fabrication, supply and erection of structural steel it included a high grade epoxy finish to all steel work (colour – Cuba).

The difficult part of the contract was the disassembly of the original manufacturing building which was build circa 1910. All that was left of this structure was the platform.

The demolition was carried out after hours upon completion of the new building.

The building was opened in July 2011